Since the last working party blog update in August another 4 working parties have taken place at Ruddington (19th September, 11th October, 8th November, 15th November), where our focus has been on dismantling, degreasing, wire brushing, labelling and assessing the multiple parts of the tender brake gear. 15th November saw 10 volunteers turning up to help out which is probably a record for the last decade atleast, great to see such enthusiasm for 61264!
The stripping down of the tender chassis is almost now complete, the aim being to have it sent away for shotblasting, Non Destructive Testing (NDT) and application of a coat of primer in due course before it returns to Ruddington for painting by our volunteers. Meanwhile, those removed components will be inspected, fettled, and repainted ready for fitting back on the tender chassis when the time comes.
One of the most troublesome components on the tender to remove has been the steam brake cylinder which Jim Bailey and Ian Stamp had been battling with for several weeks; it was finally liberated on 15th November, to their relief!
Meanwhile the Trust is working on finalising the manufacturing drawings for the new tender tank and making sure that the design is well aligned to the fabricator’s processes; in other words making sure that they can actually make it! For this we have decided to call in some professional assistance and as such, an Invitation to Tender (ITT) for ‘tender design drawings and project management’ was circulated to various Engineering companies in early October. Five companies expressed interest. During October half term they were given the chance to speak with Tony Stockman (our volunteer who has produced the 3D CAD model of the new tender tank) and the fabricating company (Hill & Webster). They all submitted costed proposals by the deadline given to them of 6th November and the Trust is now assessing those proposals, taking into account not only what is being offered but what we can afford.